Project Status:
Finished
Client :
Jam Petrochemical
Executive Operations :
1. Complete implementation of the power system
2. Installation of M.E.G. electric list equipment
3. Carrying out the cathodic protection system of the PE petrochemical unit of Jam
Year of implementation :
1384